changing scene and keeping assets

I need to change My scene but I have already coded assets to go In the one that I have, Is there a simple way to port my assets over to the new scene without losing there components and scripts attached to them?

You can select the objects from one scene (CTRL + C / CMD + C), then open the other scene and paste them (CTRL + V / CMD + V)

You can also open the 1st scene, drag & drop your 2nd one in the Hierarchy tab, then drag & drop the desired objects from scene 1 to scene 2

158185-scene.png

thank you!