How long should 3.0 occlusion culling take?

I started occlusion culling on a fairly simple level about 3 hours ago, and it’s still running. The process is running 5 threads and is utilizing about 1 of my 4 cores.

At what point do I give up on it and try again?

if you do production building and have the standard cam clip planes or even smaller near clip it can easily take up to 4+ hours even for small levels, thats at least the longest I had on my 2008 mbp with its 2x 2.4ghz c2d

I would recommend to spare the production build till the deployment and work with less precision before