Hi
Downloaded a asset from the store it has a scene with terrain and rocks.In task manager shows 900mb are commited the memory usage on the rocks is 10 times the terrains. But if i make a prefab of the terrain open a blank scene and put the terrain prefab in the scene my commit total goes to 1.2 gig and crashes my comp(win 7 32 bit).
So 2 questions
1.why does a terrain prefab require 10 times its normal commit value?.
2.Why does Unity crash when my memory usage is only around 60 percent?.Is this windows or Unity’s fault?
For instance i can open chrome then put terrain prefab in scene and the comp will crash at 75+percent then because it seems to be based on the commit value and not on how much ram is still available whether i have 60 percent or 75 it will crash when commit value goes above 1.2gig.