The Agile Method

Something which I have noticed on the forum is that people are encouraged to use the waterfall method by creating thorough GDDs. This makes a successful post, but will the game actually get finished? Is the GDD that one flaw that will ruin the project, possibly because the game called for is too big?

The agile method seems to work well some of the time. I make games half the time using the agile method.

Like I said, now you are just writing whatever comes to mind. You had never heard of the “agile” method or the “waterfall” method before Paradigm (I think it was him) posted about it. Do you even know what they are?

I have a feeling you are one massively elaborate troll.

I read up on it after it was posted. It covers some of my thoughts that I didn’t have words for before.

sigh I’m just making games with 1337_hax_ftw.

cite - Project management office - Wikipedia

See that last part - the 69% failure rate of projects attributed to improper implementation of project management methodologies, well, that’s where you are (in amidst a myriad of other issues). Agile project development is not something you can just do off the cuff, especially if you have never completed a project before. Google works well with the agile method of development, and a lot of their small side projects are developed because the developer simply wanted to do them. They are often experimental in nature.

Please stop this. Make your card game instead of telling us that there is a new love interest or the blue devil is bad or you have a new idea for a card. A week ago, I posted a script that built a deck of 52 playing cards for use in card games. It took me a little over 2 hours (it was the first time I have used classes in almost 10 years). In one week, you have done nothing but tell us that some guy is working on a terrain, you and 1337 have to deliberate on your game ideas.

You are stalling, because you have no idea what to do or where to go because you have no direction. Make the card game. Add trimming afterwards. If you can’t even make the core of the game, what is the point of all the terrain and other stuff.

Agile development in general has good and bad. But I can tell you that it does NOT lack a plan. If you do not have a plan, you will likely not succeed. A bigger project always has some sort of design, regardless of whether you use Agile or waterfall.

1337_hax_ftw isn’t around much. He might be busy on demo 4 of The Forbidden or something.

I don’t get why people talk about GDDs and “methods” and approaches so much. At the end of the day, it’s whether or not you end up with a completed game that’s important, NOT how you got there. If your method (whatever it is) results in you successfully creating something, then THAT’S the method you should use. I don’t think there’s a single, correct answer to this sort of discussion.

Using a game design doc does not necessitate the waterfall method, or any other method for that matter.

For starters, it’s a game design doc, not a technical design doc, or a software design doc. It should be used to ensure that all members of the dev team have a shared vision of what’s to be achieved, not to tell them how to make it.

I really think that agile is the only option for casual games development.
We show our game to beta-testers and product owner almost every day and pay great attention to their feedback.

It would be very sad if you create a game using waterfall and at the end realise it is not intersting to play…

The boundary between what is part of the game and what is part of the technical details is never clear cut. Regardless it would be still be very rigid, and not lend itself to agile development.

I think this paper-work heavy ideology may work for some of you but it’s definately not how I like to work. When I am developing I like to iterate both the development and design together. I have a general idea of what kind of game I want when I start, then as it takes shape I can more clearly see what would make it better.

What’s very rigid? A GDD? Rubbish!

I did Agile for 5 years at a previous company and there was always an initial spec/requirement/design document.
If you don’t have this initially what the hell are you actually developing? You still need that high level direction.

It’s usually the more low level stuff that is left up to the developer to determine how to best implement based on the value it provides within the scope of the original/changing design.

EDIT : And BTW, Agile is not something you just ‘read about’. It’s something that you learn over many iterations that gets finely tuned within your team over months and even years.

This is in no way constructive. I don’t know if you’re actually trying to make a point or just making an arbitrary assertion.

I guess it comes down to how high level the document is. If it’s a big up front design which goes into excruciating detail then that is what waterfall is all about. If it is broad outline of the game then that works with agile development. I agree it is important to have something at the start to make sure everyone is on the same page and working toward a common goal.

Using a formal methodology like SCRUM requires accurate estimates for burn down charts so you need to lock down on the work for the coming sprint. Beyond that you need the flexibility to adjust things, so a big up front design would undermine it completely.

We have a broad-strokes outline of the whole product and many sketches for various components. When we start work on a feature we lock down on the details based on the sketches we have.

Meh, ill use the game I’m making a blatant copy of as the GDD :slight_smile:

It appears to me that you attempted to claim that a GDD is ‘very rigid’ and does not ‘lend itself to agile development’. If so I dispute that claim. What, if anything, would make a GDD this way?

A permanent marker pen?? :smile:

NPSF3000 is right, and there is a reason that GGDs go through various versions. Nearly all the companies around my area use the agile method for game development, and it is a token trait to put on a resume (around here at least).

The company I work for uses it for our game development it in particular because adding/removing requirements is fluid. We don’t fully a make use of formal GDD, though. Instead we have a rough draft and work from there (only because our team was small and lazy with documentation).

EDIT:

Also, let it be clear that if you didn’t have a set plan and use a tracking system (sticky notes and a SCRUM board normally) that you have not developed with the agile method.

Agile isn’t what you do, it’s how you do it. Agile was never about having a list of things you could and couldn’t do. It was about finding methods that work best for your team/company, and using them. It was about cutting inefficient practices and adopting more efficient ones.

Scrum, kanban, TDD, and other practices that are labeled ‘Agile’ came from being agile, but they are not what ‘agile’ is.

Perfectly said! Have you read the Agile Manifesto?

Individuals and interactions over processes and tools
Working software over comprehensive documentation
Customer collaboration over contract negotiation
Responding to change over following a plan

While there is value in the items on the right, we value the items on the left more.

Any specific Agile methodology may have issues, but it’s hard to find fault with the statements above.
Gigi.

This is why I said “normally”. The fundamentals would require at least a set plan and a way to track progress. SCRUM was an example.